ITP

CEA Prayas

  • Policy
    • The Electricity Act, 2003
    • Manual on Planning Criteria
    • Rules on Planning & Charges
    • National Electricity Policy
    • National Tariff Policy
    • Competitive Bidding Guidelines
    • National Committee on Transmission
    • Guidelines on Communication System Planning
    • Guidelines on Cross Border Trade of Electricity
    • Guidelines for compensation - Right of Way
    • Procedure for shifting Transmission line
    • O&M guidelines for assets under TBCB
    • ISTS Waiver
    • Indian Telegraph Act, 1885
  • Commercial
    • Standard Bidding Documents
      • RfP
      • TSA
    • Project Announcements
    • Bid Process Coordinators
    • Analysis of ISTS projects under TBCB
    • TBCB Threshold in states
  • Regulatory
    • CERC GNA Regulations
    • Tariff Regulations
      • Centre
      • Andhra Pradesh
      • Assam
      • Gujarat
      • Karnataka
      • Maharashtra
      • Odisha
      • Rajasthan
      • Tamil Nadu
      • Uttar Pradesh
      • Uttarakhand
      • West Bengal
    • CERC Sharing Regulations
    • CERC Planning Regulations
    • Grid Code Regulations
      • Centre
      • Andhra Pradesh
      • Assam
      • Gujarat
      • Karnataka
      • Maharashtra
      • Odisha
      • Rajasthan
      • Tamil Nadu
      • Uttar Pradesh
      • Uttarakhand
      • West Bengal
    • Open Access Regulations
    • CERC Grant of Connectivity Regulations
    • CERC Standard of Performance Regulations
    • CEA Construction Regulations
    • CEA Safety and Supply Regulations
    • CEA Safety Standards Regulations
    • CEA Grid Standards Regulations
    • CEA Grid Connectivity Regulations
    • CERC Cross Border Trade Regulations
    • CERC Communication System for ISTS
  • Tariff
    • Tariff Orders
      • Centre
      • Andhra Pradesh
      • Assam
      • Gujarat
      • Karnataka
      • Maharashtra
      • Odisha
      • Rajasthan
      • Tamil Nadu
      • Uttar Pradesh
      • Uttarakhand
      • West Bengal
    • Inter-State Tariff
      • Annual ISTS Charges
      • ISTS Tariff (Oct 2023 onwards)
      • ISTS Tariff (Jan 2021 to Sept 2023)
      • ISTS Tariff (Till Nov 2020)
    • Intra-State Tariff
  • Performance
    • Inter-regional Transfer Capacity
    • Intra-regional Transfer Capacity
    • Congestion
    • Curtailment
    • State Transmission Performance
  • Planning
    • Inter-state Planning
      • Inter-regional Planning
      • Intra-regional Planning
    • Intra-state Planning
    • Annual Programme-Progress
      • Substations
      • Transmission Lines
    • Growth Over Plans
    • RE Integration
      • Green Energy Corridor
      • CEA Plan for 500 GW RE by 2030
    • Entity-wise Progress
    • Cross Border Transmission
    • GNA
      • GNA Allocation to STUs
      • Deemed GNA to Injecting Entities
      • Connectivity Granted under GNA
    • ISTS Network
    • CEA NEP, 2024
    • Solar and Non-solar Hour connectivity
  • Resources
    • Government Reports
    • Judicial Orders
    • Other Reports
    • Web Links
    • Glossary
  • Policy
  • Guidelines for compensation - Right of Way

Guidelines for compensation - Right of Way

On the basis of recommendations made by the committee constituted by Ministry of Power in 2015, the guidelines have been formulated for determining the compensation towards the damages in regard to Right of Way (RoW) for laying down the transmission lines in the country. The compensation is only payable for transmission lines supported by a tower base of 66 kV and above.


CEA_Advisory to Transmission Utilities to adopt new Technology options in forest area to reduce RoW 30.07.2026 
Guidelines for payment of compensation in regard to Right of Way (RoW) for transmission lines issued by MoP on 21.03.2025 
Guidelines for payment of compensation in regard to Right of Way for transmission lines (Supplementary Guidelines) 
Guidelines for payment of compensation in regard to Right of Way for transmission lines 
Guidelines for payment of compensation in regard to Right of Way for transmission lines in urban areas Guidelines for payment of compensation towards damages in regard to Right of Way for transmission lines


  • About the Portal
  • Prayas (Energy Group) & Idam Infra
  • Disclaimer

Prayas (Energy Group)
Unit III A & B, Devgiri,
Joshi Railway Museum lane,
Kothrud Industrial Area,
Kothrud, Pune,
MH 411038 India.

91-20-2542 0720
91-20-2542 0722

energy@prayaspune.org


  • Copyright © 2022 Prayas. All Rights Reserved.
  • Prayas, Pune