Government Reports

Transnational Grid connections for Ensuring Energy Security

by CEA (2023)
The paper aims to identify coordinated actions and steps in enhancing integration of power grids of various countries and regions, hence enabling either bilateral or market-based cross-border power trade. It can advance sustainable, affordable and resilient energy transition at country, regional and global levels.
Download  


Transmission System for Integration of over 500 GW RE Capacity by 2030

By CEA (2022)
The report has been prepared by a committee constituted by the Ministry of Power, in consultation with States and other stakeholders. The Plan portrays the broad transmission system roadmap for reliable integration of 537 GW RE capacity by the year 2030.
Download  


Report on Assessment of Inertia in Indian Power System

By POSOCO & IIT Bombay (2022)
The study conducted by POSOCO in collaboration with IIT Bombay has reviewed the global best practices in respect of estimation, measurement and monitoring of power system inertia and evolved a methodology for the same in the context of Indian Power System. While identifying steps needed to strengthen the existing inertia monitoring platform implemented at NLDC and RLDCs, the report provides several suggestions for consideration at the policy, regulatory and operation level to achieve the targets of 500 GW by 2030 and net zero by 2070.
Download  


Report on Task force on Cyclone Resilient Robust Electricity Transmisssion and Distribution Infrastructure in the coastal areas

By - CEA (2021)
The report was submitted by the task force constituted by Ministry of Power in June 2020 to examine types and nature of damages to electricity infrastructure due to recent cyclones in coastal areas and to recommend preventive and mitigation measures for minimizing the damages to T&D infrastructures due to cyclones in coastal areas of the country.
Download  


Planning and implementation of transmission projects by Power Grid Corporation of India Limited

By - CAG (2020)
This performance audit report by CAG assesses the effectiveness of planning and implementation of transmission projects by Power Grid Corporation of India (PGCIL) during XII Plan (2012-2017) along with augmentation of transmission network up to March 2018.
Download  


National Electricity Plan (Volume- II: Transmission) for the period of 2017-22

By - CEA (2019)
In the NEP Volume II (Transmission), the review of development of transmission system during 12th Plan Period and Planning for the ongoing plan period 2017-22 and Perspective plan for 2022-27 have been discussed.
Download  


Report of Task Force to Review Framework of Point of Connection (PoC) Charges

By - CERC (2019)
CERC consituted a Task Force to review framework of Point of Connection Charges (PoC) in July 2017, which submitted its report in April 2019. The task force was assigned task to critically examine efficacy of existing PoC mechanism, deficiency in existing mechanism and suggest modifications, if needed.
Download  


FOR Technical Committee Report on SCHEDULING, ACCOUNTING, METERING AND SETTLEMENT OF TRANSACTIONS IN ELECTRICITY (“SAMAST”)

By - Forum of Regulators (2016)
The report provides a roadmap for implementing a robust, scalable, and dispute-free scheduling, metering, accounting and settlement systems in the states. The report lays down basic framework and governance structure for SAMAST.
Download  


Report of the Committee to Review Transmission Planning, Connectivity, Long Term Access, Medium Term Open Access and other related issues

By - CERC (2016)
The committee, also known as Mata Prasad Committee, was entrusted to study "Transmission Planning, Connectivity, Long Term Access, Medium Term Open Access and other related issues" and report the same to CERC. The committee recommended some considerable changes on these aspects.
Download  


Perspective Transmission Plan for Twenty Years (2014-2034)

By - CEA (2014)
This document, prepared by CEA, has been formulated in two parts. Part one is a detailed exercise covering ISTS and Intra-State expansion plan up to the end of 13th Plan (2021-22). Part two gives broad transmission corridors that may be required in next 20 years considering generation resource potentials and demand forecast for 14th and 15th Plan ends i.e. 2031-32 and up to 2034.
Download  


Performance Audit on Planning and Implementation of Transmission Projects by Power Grid Corporation of India Limited and Grid Management by Power System Operation Corporation Limited of Union Government, Ministry of Power

By - CAG (2014)
This performance audit report by CAG assesses the effectiveness of planning and implementation of transmission projects by Power Grid Corporation of India (PGCIL) during the period of 2007-2012 along with status of augmentation of transmission network upto March 2013. It also attempts to assess the shortcomings in grid management by POSOCO in ensuring uninterrupted power supply, including Grid security and Grid monitoring, in view of major Grid disturbances on 30 and 31st July, 2012.
Download  


Ensuring adequacy in the planning and development of Inter State Transmission System

By - CEA (2013)
This report points out the need of General Network Access (GNA) and discusses various aspects related to it like implementation, benefits, pricing mechanism and action items for various central organisations.
Download  


Desert Power India -2050: Integrated Plan for Desert Power Development

By - PGCIL (2013)
The present study assesses the economic potential of renewable power generation in desert wastelands of the country (Thar, Rann of Kutch, Ladakh and Lahul & Spiti). Alongside, it covers aspects like transmission infrastructure requirement for renewable evacuation and its integration into grid and grid balancing.
Download  


Report on Grid Disturbance on 30th and 31st July, 2012

By - CERC (2012)
This report was a result of CERC's direction to investigate into the incidences of grid failure on 30th July 2012 and 31st July 2012. The report covers preliminary analysis of the grid disturbance and presents an account of sequence of the events and restoration process. The underlying causes and the suggested measures to reduce the probability of re-occurrence of such grid disturbances are discussed in the report.
Download  


REPORT OF THE ENQUIRY COMMITTEE ON GRID DISTURBANCE IN NORTHERN REGION ON 30th July 2012 AND IN NORTHERN, EASTERN & NORTH-EASTERN REGION ON 31st JULY 2012

By - Ministry of Power (2012)
The report was submitted by the Enquiry committee constituted by the Ministry of Power to analyse the causes of grid disturbances during 30th and 31st July 2012 and to suggest measures to avoid recurrence of such disturbance in future. The report gave useful recommendations on transmission system including protection system, reviewing transmission planning criteria and InSTS development.
Download  


Final Report on Partial Grid Disturbance in Mumbai System (November 2010)

By - MERC (2011)
The study aimed at analysing the grid disturbance on 18th and 21st November, 2010 in Mumbai system and find remedies to prevent similar events in future. The study also gives recommendations on protection and islanding systems, along with signalling towards need of system augmentation in the Mumbai network.
Download  


Report on Green Energy Corridor (Volume-I)

By - PGCIL (2012)
The objective of this study included identification of transmission infrastructure for likely renewable powere capacity addition in RE-rich states during the 12th plan period and providing framework for developing a model to fund the required transmission infrastructure for RE development.
Download  


Report on Green Energy Corridor (Volume-II)

By - PGCIL (2012)
The objective of this study included identification of transmission infrastructure for likely renewable powere capacity addition in RE-rich states during the 12th plan period and providing framework for developing a model to fund the required transmission infrastructure for RE development.
Download