Empowered Committee on Transmission
The MoP through its notification dated 13 April 2018, had constituted the Empowered Committee on Transmission with identified Terms of Reference for the Committee. The committee is mandated to consider the recommendations of NCT and allot projects under TBCB to BPCs.
Constitution of Empowered Committee on Transmission (ECT)
Team Composition
- Secretary(Power), GoI (Chairman)
- Chairperson, CEA (Member)
- Member(Power System), CEA (Member)
- CTU/ Chairman & Managing Director, POWERGRID (Member)
- Joint Secretary(Trans), MoP (Member Secretary)
[Clause No. 1]
- Chairperson, CEA (Member)
- Member(Power System), CEA (Member)
- CTU/ Chairman & Managing Director, POWERGRID (Member)
- Joint Secretary(Trans), MoP (Member Secretary)
[Clause No. 1]
Terms of Reference (ToR) of the Committee
- Consider the recommendations of National Committee on Transmission (NCT).
- Allot the projects under Tariff Based Competitive Bidding (TBCB) to the Bid Process Coordinators (BPCs).
[Clause No. 2]
- Allot the projects under Tariff Based Competitive Bidding (TBCB) to the Bid Process Coordinators (BPCs).
[Clause No. 2]
Meeting Frequency/ Other points
The ECT shall meet as and when required but at least once in every six months.
[Clause No. 3]
[Clause No. 3]
Resolution By
Ministry of Power
Date of Notification
4/13/2018